PROJECT NAME: THY EXECUTIVE HOTEL, PLENTONG, JOHOR BAHRU, JOHOR.
CLIENT: DEELUCC DESIGN & BUILD SDN BHD
WORK TRADE: PLASTER CEILING WORK
YEAR: 2019
PROJECT NAME: ISKANDAR GLENEAGLES MEDINI HOSPITAL, NUSAJAYA, JOHOR.
CLIENT: OBAYASHI CORPORATION
WORK TRADE: PARTITION & CEILING WORK
YEAR: 2015
PROJECT NAME: KOMTAR JBCC, JOHOR BAHRU, JOHOR.
CLIENT: LIM GLASS SDN BHD
WORK TRADE: CEILING & SKIM COATING WORKS
YEAR: 2014
PROJECT NAME: SHOPPING COMPLEX & HOTEL AT PLAZA SENTOSA JALAN SUTERA, TAMAN SENTOSA, JOHOR BAHRU, JOHOR
CLIENT: CHRISTINE INN & RECREATION SDN BHD
WORK TRADE: PLASTER CEILING WORK
YEAR: 2011
PROJECT NAME: MCDONALD
CLIENT: PRIMAA RAKAN SDN BHD
WORK TRADE: PLASTER CEILING WORK
YEAR: 2019
PROJECT NAME: MARRYBROWN
CLIENT: DEELUCC DESIGN & BUILD SDN BHD
WORK TRADE: PLASTER CEILING WORK
YEAR: 2020
RESIDENTIAL
PROJECT NAME: BOTANICA TOWER B, JALAN BAYU PUTERI 2, TAMAN BAYU PUTERI, JOHOR BAHRU, JOHOR.
CLIENT: HINZ SOLUTION SDN BHD
WORK TRADE: PLASTER CEILING WORKS
YEAR: 2021
PROJECT NAME: SERVICE APARTMENT, SKYTREE AT BUKIT INDAH
CLIENT: KIM LUN SDN BHD
WORK TRADE: PLASTER CEILING WORKS
YEAR: 2021
PROJECT NAME: 30-STOREY DEVELOPMENT, PTD 200671 (F23), MEDINI, MUKIM PULAI, DAERAH JOHOR BAHRU JOHOR DARUL TAKZIM UNTUK TETUAN SUNWAY ISKANDAR SDN BHD
CLIENT: KIM LUN SDN BHD
WORK TRADE: PLASTER CEILING WORKS
YEAR: 2021
PROJECT NAME: WATERSIDE RESIDENCES, 1700, JALAN PANTAI SINARAN, GELUGOR, PULAU PINANG
CLIENT: WINDTECH GLASS & HARDWARE SDN BHD
WORK TRADE: PLASTER CEILING WORKS
YEAR: 2019
PROJECT NAME: SERVICE APARTMENT, SKS PAVILLION, JOHOR BAHRU
CLIENT: SIN SIN CONSTRUCTION SDN BHD
WORK TRADE: PLASTER CEILING WORKS
YEAR: 2019
PROJECT NAME: ALMAS SUITE, PERSIARAN LAKSAMANA, PULAI JOHOR BAHRU, JOHOR.
CLIENT: IJM CONSTRUCTION SDN BHD
WORK TRADE: PLASTER CEILING WORKS
YEAR: 2019
PROJECT NAME: CENTRAL PARK PLOT 2 PHASE 1 PROJECT, DAMANSARA ALIFF JOHOR BAHRU.
CLIENT: CHINA CONSTRUCTION ENGINEERING (S.E.A) MALAYSIA SDN. BHD.
WORK TRADE: PLASTER CEILING WORKS
YEAR: 2018
PROJECT NAME: PLOT 1 (BLOK 1D), PERSIARAN ABU BAKAR SULTAN COUNTRY GARDEN DANGA BAY, JOHOR BAHRU, JOHOR.
CLIENT: CHINA CONSTRUCTION ENGINEERING (S.E.A) MALAYSIA SDN. BHD.
WORK TRADE: PLASTER CEILING WORK
YEAR: 2017
PROJECT NAME: PLOT 1 (BLOCK 1D1 & BLOCK 1D2), PERSIARAN ABU BAKAR SULTAN COUNTRY GARDEN DANGA BAY, JOHOR BAHRU, JOHOR.
CLIENT: ACTIVE PRECISION BUILDER SDN. BHD.
WORK TRADE: PLASTER CEILING WORK
YEAR: 2017
PROJECT NAME: 1255 UNITS 8SCAPE RESIDENCES @ SUTERA, JOHOR BAHRU, JOHOR.
CLIENT: SIN SIN CONSTRUCTION SDN BHD
WORK TRADE: PLASTER CEILING WORKS
YEAR: 2019
PROJECT NAME: SERVICE APARTMENT IOI PLATINO, TAMAN BUKIT MEWAH, JOHOR BAHRU, JOHOR.
CLIENT: SIN SIN CONSTRUCTION SDN BHD
WORK TRADE: PLASTER CEILING WORK
YEAR: 2016
PROJECT NAME: 976 UNITS SERVICE APARTMENT (THE SEASON APT, AMARA LARKIN)
CLIENT: SIN SIN CONSTRUCTION SDN BHD
WORK TRADE:PLASTER CEILING WORK
YEAR: 2016
PROJECT NAME: 63 UNITS DSTH TAMAN EKOFLORA, JOHOR BAHRU, JOHOR.
CLIENT: PYRAMID PHASE SDN BHD
WORK TRADE: PLASTER CEILING WORKS
YEAR: 2021
PROJECT NAME: 525 UNIT RUMAH DSTH, DANGA SUTERA, JOHOR BAHRU, JOHOR.
CLIENT: HINZ SOLUTIONS SDN BHD
WORK TRADE: PLASTER CEILING WORKS
YEAR: 2020
PROJECT NAME: 12 UNITS DSCH (PARCEL 2) TAMAN DESA TEBRAU, JOHOR BAHRU, JOHOR
CLIENT: KALSARI JAYA SDN BHD
WORK TRADE: PLASTER CEILING WORKS
YEAR: 2020
PROJECT NAME: 110 UNITS CLUSTER HOUSE 3 STOREY, JALAN PERSIARAN BUMI HIJAU, JOHOR BAHRU, JOHOR.
CLIENT: INTA BINA SDN BHD
WORK TRADE: PLASTER CEILING WORKS
YEAR: 2020
PROJECT NAME: 100 UNITS DOUBLE STOREY CLUSTER HOUSE, TAMAN DESA TEBRAU, JOHOR BAHRU, JOHOR.
CLIENT: PYRAMID PHASE SDN BHD
WORK TRADE: PLASTER CEILING WORKS
YEAR: 2020
PROJECT NAME: 75 UNITS DSTH TYPE A (20' X 70'), SERIMBUN, ISKANDAR PUTERI, JOHOR BAHRU, JOHOR.
CLIENT: INTA BINA SDN BHD
WORK TRADE: PLASTER CEILING WORKS
YEAR: 2019
PROJECT NAME: 84 UNIT DOUBLE STOREY CLUSTER HOUSE (32’ X 65’), TAMAN AUSTIN DUTA, JOHOR BAHRU, JOHOR.
CLIENT: KALSARI JAYA SDN BHD
WORK TRADE: PLASTER CEILING WORKS
YEAR: 2019
PROJECT NAME: 234 UNITS DSTH (22' X 75') TAMAN DESA TEBRAU, JOHOR BAHRU. JOHOR.
CLIENT: KALSARI JAYA SDN BHD
WORK TRADE: PLASTER CEILING WORKS
YEAR: 2019
PROJECT NAME: 28 UNITS DSTH, 32 UNITS DSCH (TYPE A), 14 UNITS DSCH (TYPE B), 18 UNITS 3SCH, 16 UNIT 2 STOREY SEMI -DETACHED HOUSE, BANDAR CEMERLANG, JOHOR BAHRU, JOHOR.
CLIENT: KALSARI JAYA SDN BHD
WORK TRADE: PLASTER CEILING WORKS
YEAR: 2016
PROJECT NAME: 12 UNITS 3 STOREY BUNGALOW, PRESINCT WATERFRONT, JOHOR BAHRU, JOHOR.
CLIENT: MAGNA HAVEN SDN BHD
WORK TRADE: PLASTER CEILING WORKS
YEAR: 2017
PROJECT NAME: 140 UNITS DSCH, TAMAN KOTA MASAI, PASIR GUDANG, JOHOR BAHRU, JOHOR. (ECO TROPICS)
CLIENT: PEMBINAAN PROLI SDN BHD
WORK TRADE: CEILING & SKIM COAT WORK
YEAR: 2017
PROJECT NAME: ''HOLIDAY HOME RESORT'' 147 UNIT RUMAH TERES 2 TINGKAT (22' X 80'), JOHOR BAHRU, JOHOR. (ECO SPRINGS)
CLIENT: PYRAMID PHASE SDN BHD
WORK TRADE: PLASTER CEILING WORK
YEAR: 2018
PROJECT NAME: 43 UNITS DSTH (18' X 60'), MUKIM PENGERANG, KOTA TINGGI, JOHOR.
CLIENT: ACTIVE BUILDING CONSTRUCTION SDN. BHD.
WORK TRADE: PLASTER CEILING WORK
YEAR: 2017
PROJECT NAME: DSTH & THREE STOREY SUPERLINK HOUSE D'ESTUARY PUTERI HARBOUR, NUSAJAYA, JOHOR BAHRU, JOHOR.
CLIENT: INTA BINA SDN BHD
WORK TRADE: PLASTER CEILING WORK
YEAR: 2016
PUBLIC AMENITIES
PROJECT NAME: CIQ COMPLEX, DESARU KOTA TINGGI JOHOR.
CLIENT: BA URUS BINA (M) SDN BHD
WORK TRADE: DRYWALL PARTITION & CEILING WORKS
YEAR: 2021
PROJECT NAME: BANGUNAN PEJABAT MAJLIS BANDARAYA ISKANDAR PUTERI 15 TINGKAT BANDAR ISKANDAR PUTERI, DAERAH JOHOR BAHRU, JOHOR.
CLIENT: AIK SENG GLASS AND ALUMINIUM SDN BHD
WORK TRADE: PARTITION & PLASTER CEILING WORKS
YEAR: 2021
PROJECT NAME: PEJABAT LHDN CAWANGAN KLUANG
CLIENT: YONFATT CONSTRUCTION SDN BHD
WORK TRADE: PARTITION,CEILING AND ALUM. STRIP CEILING WORK
YEAR: 2019
PROJECT NAME: MARTABARI ULTRA SUPER CRITICAL COAL FIRED POWER PROJECT PACKAGE 1.2, BANGLADESH AT BATAM INDONESIA
CLIENT: TWIN-STEEL ENGINEERING WORKS SDN BHD
WORK TRADE: PARTITION & CEILING WORK
YEAR: 2017
PROJECT NAME: KEM ASKAR TIMBALAN SETIA NEGERI (TSN), JALAN DATIN HALIMAH, JOHOR BAHRU, JOHOR.
CLIENT: KTN CONSTRUCTION SDN. BHD.
WORK TRADE: TIMBER CEILING WORKS
YEAR: 2015
PROJECT NAME: SENAI AIRPORT AVIATION PARK, SENAI INTERNATIONAL AIRPORT, SENAI, KULAIJAYA, JOHOR.
CLIENT: ZAFIRA BINA SDN BHD
WORK TRADE: PLASTER CEILING WORKS
YEAR: 2016
PROJECT NAME: DEWAN SERBAGUNA BANDAR PENAWAR, JALAN PERSIARAN DESARU UTAMA 2, TAMAN DESARU UTAMA, KOTA TINGGI, JOHOR.
CLIENT: KTN CONSTRUCTION SDN. BHD.
WORK TRADE: PLASTER CEILING WORKS
YEAR: 2019
EDUCATIONAL
PROJECT NAME: SEKOLAH JENIS KEBANGSAAN (CINA) CHEAH FAH, SUNWAY ISKANDAR, JOHOR BAHRU, JOHOR.
CLIENT: LAUBROS HOLDINGS (M) SDN BHD
WORK TRADE: PLASTER CEILING WORKS
YEAR: 2021
PROJECT NAME: REPTON INTERNATIONAL SCHOOL AT BANDAR SERI ALAM
CLIENT: HINZ SOLUTIONS SDN BHD
WORK TRADE: PARTITION,CEILING AND ALUM. STRIP CEILING WORK
CADANGAN MEMBINA DAN MENYIAPKAN 525 UNIT RUMAH TERES 2 TINGKAT FASA 1; i) 134 UNIT RUMAH TERES 2 TINGKAT (20' X 72') JENIS A; ii) 182 UNIT RUMAH TERES 2 TINGKAT (22' X 72') JENIS B; iii) 60 UNIT RUMAH TERES 2 TINGKAT (22' X 72') JENIS B1; iv) 123 UNIT RUMAH TERES 2 TINGKAT (24' X 72') JENIS C; v) 26 UNIT RUMAH TERES 2 TINGKAT (25' X 72') JENIS C; vi) 4 UNIT PENCAWANG ELEKTRIK (DUA RUANG); vii) 1 UNIT PONDOK PENGAWAL DAN 'ENTRANCE STATEMENT'; viii) PERIMETER FENCING; ix) 1 UNIT 2-TINGKAT RUMAH KELAB BESERTA KEMUDAHAN ASAS DI ATAS SEBAHAGIAN LOT 2476, 2680 (LOT BARU LOT 18647) & 2734,
CLIENT : HINZ SOLUTIONS SDN BHD PROJECT
AMOUNT : RM 1,800,000.00
DATE OF COMMENCEMENT : 30 Jul 19
DATE OF COMPLETION :
WORK TRADE : PLASTER CEILING WORKS
RE:- QUOTATION OF PARTITION & CEILING WORKS FOR CADANGAN PEMBANGUNAN BERCAMPUR BERSTRATA, 30 TINGKAT YANG MENGANDUNGI:
FASA 1:A) 1 BLOK KOMERSIAL 4 TINGKAT YANG MENGANDUNGI: i) 2 TINGKAT RUANG PEJABAT (62 UNIT) ARAS 2 DAN 3 ii) 1 TINGKAT RUANG PEJABAT (12 UNIT) DAN RUANG PERNIAGAAN (16 UNIT ARAS 1) iii) 1 TINGKAT RUANG PERNIAGAAN (25 UNIT) ARAS TANAH B) 1 TINGKAT TEMPAT LETAK KENDERAAN DI ARAS TANAH C) 1 TINGKAT TEMPAT LETAK KENDERAAN DI SUB-BASEMEN
FASA 2:A) 1 BLOK PANGSAPURI 28 TINGKAT YANG MENGANDUNGI: i) 1 BLOK PANGSAPURI 22 TINGKAT (501 UNIT) ARAS 6-27 ii) PODIUM TEMPAK LETAK KENDERAAN 6 TINGKAT BESERTA KEMUDAHAN DI ATAS PTD 200671 (F23), MEDINI, MUKIM PULAI, DAERAH JOHOR BAHRU JOHOR DARUL TAKZIM UNTUK TETUAN SUNWAY ISKANDAR SDN BHD
CLIENT : KIM LUN SDN BHD
PROJECT AMOUNT : RM 833,442.78
DATE OF COMMENCEMENT : 11-Jun-19
DATE OF COMPLETION : 28-Feb-21
WORK TRADE : PARTITION & PLASTER CEILING WORKS
CADANGAN MEMBINA: i) 100 UNIT RUMAH KLUSTER 2 TINGKAT (FASA 1) DI ATAS PTD 193887 – PTD 193906, PTD 193931 – PTD 193950, PTD 193975 – PTD 193994 & PTD 194019 – PTD 194058 ii) 1 UNIT PENCAWANG ELECTRIK DI ATAS PTD 193868 TAMAN DESA TEBRAU, MUKIM TEBRAU, DAERAH JOHOR BAHRU, JOHOR DARUL TAKZIM FOR PLENITUDE TEBRAU SDN BHD
CLIENT : PYRAMID PHASE SDN BHD
PROJECT AMOUNT : RM 200,000.00
DATE OF COMMENCEMENT : 17-Aug-19
DATE OF COMPLETION :
WORK TRADE : PLASTER CEILING WORKS
PROPOSED CONSTRUCTION OF: 112 UNITS DOUBLE STOREY CLUSTER HOUSE ON PTD 193852 - PTD 193867, PTD 193875 - PTD 193886, PTD 193907 - PTD 193930, PTD 193951 - PTD 193974, PTD 193995 - PTD 194018 & PTD 194059 - PTD 194070, PHASE 19 & 20 (PARCEL 2) TAMAN DESA TEBRAU, DAERAH JOHOR BAHRU, JOHOR DARUL TAKZIM MESSRS PLENITUDE TEBRAU SDN BHD
CLIENT : KALSARI JAYA SDN BHD
PROJECT AMOUNT : RM 500,000.00
DATE OF COMMENCEMENT : 1-Sep-19
DATE OF COMPLETION : 30-Apr-20
WORK TRADE : PLASTER CEILING WORKS
CADANGAN PEMBANGUNAN BERSTRATA PLOT F32 UNTUK MENDIRIKAN 361 UNIT RUMAH TERES, RUMAH KLUSTER DAN RUMAH BANDAR YANG MENGANDUNGI: FASA 3: i. 64 UNIT RUMAH TERES 2 TINGKAT JENIS B ii. 64 UNIT RUMAH KLUSTER 2 TINGKAT JENIS D
DI ATAS PTD 200677, MUKIM PULAI, DAERAH JOHOR BAHRU, JOHOR DARUL TAKZIM UNTUK TETUAN SUNWAY ISKANDAR SDN BHD
CLIENT : KALSARI JAYA SDN BHD
PROJECT AMOUNT : RM 500,000.00
DATE OF COMMENCEMENT :
DATE OF COMPLETION :
WORK TRADE : PLASTER CEILING WORKS
CADANGAN MEMBINA 234 UNIT RUMAH TERES 2 TINGKAT (22' X 75') YANG MENGANDUNGI: FASA 1; I) 118 UNIT RUMAH TERES DUA TINGKAT (22' X 75'); II)2 UNIT PENCAWANG ELEKTRIK; III) 1 UNIT PONDOK PENGAWAL; FASA 2; I)116 UNIT RUMAH TERES 2 TINGKAT (22' X 75'); DI TAMAN DESA TEBRAU, JOHOR BAHRU. JOHOR DARUL TAKZIM UNTUK PLENITUDE TEBRAU SDN BHD
CLIENT : KALSARI JAYA SDN BHD
PROJECT AMOUNT : RM 585,117.00
DATE OF COMMENCEMENT : 15-Mar-17
DATE OF COMPLETION : 14-Apr-18
WORK TRADE : PLASTER CEILING WORKS
CADANGAN PEMBANGUANAN PERUMAHAN YANG MENGANDUNGI: A) 84 UNIT RUMAH HLUSTER 2 TINGKAT (32’ X 65’) JENIS SIRI ‘A’ DI ATAS PTD 183086- PTD 183169
B) 1 UNIT PENCAWANG ELEKTRIK TNB (DOUBLE CHAMBER) DI ATAS PTD 183170 TAMAN AUSTIN DUTA, MUKIM TEBRAU, DAERAH JOHOR BAHRU, JOHOR DARUL TAKZIM.
CLIENT : KALSARI JAYA SDN BHD
PROJECT AMOUNT : RM 500,000.00
DATE OF COMMENCEMENT : 11-Dec-18
DATE OF COMPLETION : 31-Aug-19
WORK TRADE : PLASTER CEILING WORKS
CADANGAN MEMBINA 112 UNIT KEDAI PEJABAT DUA TINGKAT DAN TIGA TINGKAT (FASA 1) YANG MENGANDUNGI: a) 24 UNIT KEDAI PEJABAT 3 TINGKAT (22' X 72') b) 24 UNIT KEDAI PEJABAT 2 TINGKAT (22' X 72') c) 64 UNIT KEDAI PEJABAT 2 TINGKAT (22' X70') d) 1 UNIT PENCAWANG ELECTRIK DI ATAS LOT 68984 (PTD 11723), TAMAN PERINDUSTRIAN PEKAN NENAS, MUKIM JERAM BATU, DAERAH PONTIAN, JOHOR DARUL TAKZIM.
CLIENT : SIN SIN CONSTRUCTION SDN BHD
PROJECT AMOUNT : RM 500,000.00
DATE OF COMMENCEMENT : 16-Jul-18
DATE OF COMPLETION :
WORK TRADE : PLASTER CEILING WORKS
CEILING WORKS FOR CADANGAN MEMBINA 25 TINGKAT PANGSAPURI (1255 UNIT), 6 TINGKAT PODIUM, RUMAH KELAB, 4 UNIT RUMAH SAMPAH & 1 UNIT RUMAH PONDOK PENGAWAL DI ATAS LOT 156268, JALAN SUTERA KUNING, MUKIM PULAI, DAERAH JOHOR BAHRU JOHOR. (8 ESCAPE)
CLIENT : SIN SIN CONSTRUCTION SDN BHD
PROJECT AMOUNT : RM 500,000.00
DATE OF COMMENCEMENT : 25-Aug-16
DATE OF COMPLETION : 1-Dec-19
WORK TRADE : PARTITION & PLASTER CEILING WORKS
MAIN BUILDING WORKS AND ASSOCIATED EXTERNAL WORKS FOR PEMAJUAN BANGUNAN PERDAGANGAN 2 TINGKAT BESERTA SUB-BASEMENT DI ATAS PTB 20126, JALAN TAMPOI, MUKIM BANDAR JOHOR BAHRU, DAERAH JOHOR BAHRU, JOHOR FOR MESSRS CHEMPAKA LOGISTIK SDN BHD (PARAGON MARKET)
CLIENT : SIN SIN CONSTRUCTION SDN BHD
PROJECT AMOUNT : RM 900,000.00
DATE OF COMMENCEMENT : 17-Apr-19
DATE OF COMPLETION : 31-Oct-19
WORK TRADE : PARTITION & PLASTER CEILING WORKS
PROPOSED CONSTRUCTION AND COMPLETION OF PACKAGE 2A CONSISTING OF:- 1) 75 UNITS OF DOUBLE STOREY TERRACE HOUSE TYPE A (20' X 70'); 2) 1 UNIT OF TNB SUBSTATION; INCLUDING INFRASTRUCTURE WORKS AT SERIMBUN ON PTD 116766, ISKANDAR PUTERI, MUKIM PULAI, DAERAH JOHOR BAHRU, JOHOR DARUL TAKZIM FOR NUSAJAYA GREENS SDN BHD
CLIENT : INTA BINA SDN BHD
PROJECT AMOUNT : 200,841.00
DATE OF COMMENCEMENT : 22-Oct-18
DATE OF COMPLETION : 5-Jul-19
WORK TRADE : PLASTER CEILING WORKS
CADANGAN PEMBANGUNAN 110 UNIT PEMAJUAN HOLIDAY HOME PERUMAHAN STRATA FASA 1B YANG MENGANDUNGI:- FASA 1 (PARCEL A); 1) RUMAH BERKEMBAR 3 TINGKAT JENIS D1 (40' X 80') - 34 UNIT; 2) RUMAH BANGLO 3 TINGKAT JENIS D1 (50' X 90') - 2 UNIT; FASA 1 (PARCEL B); 1) RUMAH BERKEMBAR 3 TINGKAT JENIS D1 (40' X 80') - 342 UNIT; 2) STESEN TNB - 2 UNIT; 2) RUMAH SAMPAH - 1 UNIT; DI ATAS SEBAHAGIAN LOT PTD 231844, JALAN PERSIARAN BUMI HIJAU, MUKIM PLENTONG, DAERAH JOHOR BAHRU, JOHOR DARUL TAKZIM UNTUK TETUAN SUNWAY CITY (JB) SDN BHD.
CLIENT : INTA BINA SDN BHD
PROJECT AMOUNT : RM 441,540.00
DATE OF COMMENCEMENT : 8-Nov-18
DATE OF COMPLETION : 15-Jul-19
WORK TRADE : PLASTER CEILING WORKS
CADANGAN MEMDIRIKAN SATU BLOK PEMBANGUNAN YANG MENGANDUNGI: 1) MENARA PANGSAPURI A-33 TINGKAT (116 UNIT); 2) MENARA PANGSAPURI B-25 TINGKAT (84 UNIT); 3) MENARA PANGSAPURI C-17 TINGKAT (56 UNIT) DAN PODIUM LETAK KERETA 4 TINGKAT DI ATAS TAPAK PEMBANGUNAN TEBUSGUNA, PLOT A1-3, PARSEL A1, JALAN PANTAI SINARA, SEKSYEN 8, BANDAR GEORGETOWN DAERAH TIMUR LAUT, PULAU PINANG UNTUK TETUAN JELUTONG DEVELOPMENT SDN BHD
CLIENT : WINDTECH GLASS & HARDWARE SDN BHD
PROJECT AMOUNT : RM 500,000.00
DATE OF COMMENCEMENT : 1-Jan-19
DATE OF COMPLETION : 1-Oct-19
WORK TRADE : PLASTER CEILING WORKS